Case Introduction

2 electric hot water boilers for heating in Qinghai Yushu No. 1 Heating Company

China

The person in charge of the enterprise project who worked with us this time said that the winter temperature in Yushu area can reach about minus 20 degrees. The heating season lasts from October of that year to April of the following year. We are very troubled by the issue of heating. The Fangkuai boiler helped us solve this problem perfectly and ensure the normal operation of heating work in winter.

  • Product name:hot water boiler
  • Industry involved:Heating industry
  • Use fuel:Electricity
  • Rated evaporation:1.75MW
  • Product model:WDR1.75-95/70-Ⅱ
  • Application areas:Heating

Project proposals

The cooperation with Zhengzhou Fangkuai Boiler this time is a heating company located in Yushu City, Qinghai Province. Yushu Tibetan Autonomous Prefecture is a jewel next to Kunlun Mountain. The unique alpine climate makes the local average daily minimum temperature only -3 degrees, with a total of 283 days of rainy weather throughout the year and 22 days of snowfall. "Electric boiler, long heating cycle, used by Tibetans in Tibetan areas, and local plateau environment." Many keywords were quickly converted into data indicators on CAD drawings. With the R&D center as the main body, the company quickly formed a project team. Started boiler design. After careful consideration of the existing products, the R&D personnel determined to meet the needs of the other party in the form of an electric vacuum hot water boiler (WDR1.75-95/70-Ⅱ).

Product advantages

Taking into account the objective environment in Yushu area, when designing the boiler, we have integrated the possible performance of the product in Tibetan areas more deeply. The project team members checked the transportation routes along the Baidu map, checked the weather conditions of each section of the route, and marked the possible transportation delays caused by complicated weather. Based on the above information, the project team members have different levels of requirements for the production of the two boilers every day to ensure that they can be delivered in advance. With the unremitting efforts of the Haihe production team, the two boilers, which have a deep friendship for Tibetan compatriots, completed production one day ahead of schedule and are ready to be shipped.

80% of the industry leaders, choose FANGKUAI